svetz
Works in theory! Practice? That's something else
... You must have been on the waiting list with deposit/pre-order months ago. Surprised the installer allowed the AC to be on the backup circuit!
I think it was more that I lucked out as one of the areas the Enphase wanted to deploy in first. I don't have a critical-circuits, I control what's on/off by their switches or the load center....you can read more on that here. If I pull to many amps it resets; no waiver needed. Someday I'll get the automation together....so much to do so little money.... <sigh>
Last edited: