Solar123456
New Member
- Joined
- Jun 4, 2021
- Messages
- 79
Perhaps. The buyer rejected my initial proposal of 30 percent and countered with 0 or ship them back for an 90% refund. Upon reflection, I should asked for more in the beginning since the lower capacity cells are going to lower the overall capacity of the entire pack if I were to keep them and use them and it would cost close to that much to replace them with the cost of shipping.
Even after that, I still have to figure how fix the crooked threads on 4 of the other 8 cells which is going to take time to research, labor and materials. Could I live with 30 percent sure but I’d rather of paid extra to more reputable vendor for a better quality product that I thought I was getting.
Even after that, I still have to figure how fix the crooked threads on 4 of the other 8 cells which is going to take time to research, labor and materials. Could I live with 30 percent sure but I’d rather of paid extra to more reputable vendor for a better quality product that I thought I was getting.