Not following here, you say 5K of PV input. With 72.9VMP, you can run 2S4P and 2S3P. That is easily handled by something like this
https://watts247.com/product/spf-3000tl-lvm-es/ which has 120V to 250V max input and max 80A per unit if you parallel two units. Or you can buy one unit, limit yourself on load and just add another CC just to harvest the PV output.
Or if you want a single All In One:
https://watts247.com/product/new-gr...se-120v-240v-output-100a-at-120v-50a-at-240v/ and run 3S2P on 2 strings in case your distance from PV array to unit is long. Granted, you have 14 panels but voltage drop can play into this. You can't run 4S, VMP get's too high. You could again add a separate charge controller for those 2 panels and just hook the CC to the busbars. Many options out there.
You will probably find the 9600w of battery power lacking in capacity if this is for residential usage. Weekend cabin you might get by. I'd seriously consider adding more. As you keep adding things for the load, (we all do) then next you will want to upgrade. Keep this in mind so you don't shortchange yourself down the road.