Wired the battery warmer in before the BMS, so the solar panel can warm the LiFePos cells if the heating pad temperature controller calls for it.
Of course if the BMS temp sensor is above the the cutoff temp the cells can warm the package.
Should I put a fuse between the Epever charge controler and the warming blanket, just has the temperature switch with16ga wire?
Of course if the BMS temp sensor is above the the cutoff temp the cells can warm the package.
Should I put a fuse between the Epever charge controler and the warming blanket, just has the temperature switch with16ga wire?