Nobodybusiness
Collecting the leftovers of the Great Sky Reactor.
Let us know what you think.Anyone else have theirs coming soon? Mine is delivered tomorrow
Send lots of pictures..
Let us know what you think.Anyone else have theirs coming soon? Mine is delivered tomorrow
Wow that's cool!Anyone else have theirs coming soon? Mine is delivered tomorrow
Let us know what you think.
Send lots of pictures..
agree - his latest video shows one in the background connected at his personal location but made no mention of it. It is big...Wow that's cool!
I am kind of shocked that Engineer775 has not released a video yet.
He has one in his power shed but hasn’t made any videos yet.Wow that's cool!
I am kind of shocked that Engineer775 has not released a video yet.
Pics please of before during and after install then a full operational status report after you get it up and goingAnyone else have theirs coming soon? Mine is delivered tomorrow
Where did you order it from?Will do! Official install will be in a few weeks... moving the mains is a job i let the electrians do
Yeah I saw the video yesterday. I suspect he already made a video of the installation and setup.agree - his latest video shows one in the background connected at his personal location but made no mention of it. It is big...
Northern Arizona wind solarWhere did you order it from?
It looks like my strategy of ordering from the closest retailer to my house didn't pay offNorthern Arizona wind solar
Nice. My installer says no deliveries so now it looks like I need to fire them and do self install.Northern Arizona wind solar
Yeah I tried to get an installer to do it. They'd only do the 12k not 15. AnnoyingNice. My installer says no deliveries so now it looks like I need to fire them and do self install.
Do the neutral and ground connections require lugs?Electric cabinet. Will do a temp install tomorrow maybe ? (Offgrid and power house through interlock). Trying to arrange the perminate install but it requires moving the mains so I'm waiting on power company and electrian to get a temp disconnect for that
View attachment 94209
appears that way (I just noticed this and checked too), which is somewhat odd as its hard to get lugs on normal wireDo the neutral and ground connections require lugs?
Will lyk tomorrow when I do a temp install!I guess I better finally order a hydraulic crimper. What size of hex bit do those other terminals use? I better order one of those while I'm at it too.
Sexy BeastElectric cabinet. Will do a temp install tomorrow maybe ? (Offgrid and power house through interlock). Trying to arrange the perminate install but it requires moving the mains so I'm waiting on power company and electrian to get a temp disconnect for that
View attachment 94209
I was absolutely not expecting it until mid/late june....I am now nagging the electric company to give me a shutoff LOL. but a temp install (no ac pass through) is still pretty fun for a whileSexy Beast
I did a few call today and everyone is saying the First week of June before they will be in stock.
You seem to have gotten real lucky. BTW they really went to great lengths to makes sure it was not any Wider than the 12K. I guess they figure a lot of there wealthier 12K owner will want a drop in replacement.