You need to figure out what your daily power needs are first and work back from there. When you know you power usage or goal, you can then build and battery bank to suit. You will then also need enough panels to produce that power consistently. Dont forget to consider that some days you will...
I was able to create my own anderson parallel cables by using different sized contacts inside the connectors. Powerwerx sells the contacts for wire sizes 6 through 1/0. For two 4 gauge wires I used a size 2 contact, which fit nice and snug and soldered up great.
Oh I was simply making and observation. The public should expect prices to fluctuate with the market
I have been nothing but pleased with my purchase from BigBattery, and chose to purchase largely due to value, availability, and ease of use.
I do wish I could access the information on the BMS...
I think you are better off wiring in parallel with one SCC and getting another simple battery/charger of some kind for your mobile needs. Wiring them with a y connection is just more wire length between a parallel connection when you should be going for the shortest length wire or busbar...
I ordered 3 of the Plug and Play A123 batteries from bigbattery on Monday 10/12, they shipped on 10/22 and were delivered to me 10/24 via Fedex.
They were well packed and appear to be well made. I have attached some photos of the way the arrived and the BMS.
I did a capacity test on one of...
I purchased 3 of these and have only tested 1, but all three have charged to 28.8 and held 28.6 after resting. I am new at this so take it with a grain of salt.
I ordered 3 of the Plug and Play A123 batteries from bigbattery on Monday 10/12, they shipped on 10/22 and were delivered to me 10/24 via Fedex.
They were well packed and appear to be well made. I have attached some photos of the way the arrived and the BMS.
I did a capacity test on one of...