Actually I just downloaded full Excel sheet from that URL and it has all kinds of additional information not showing on energy.ca.gov webpage. It appears that *all* SRNE inverters have Intertek UL1741SB certificate dated 1/25/2024 and they were then grid approved (i.e. added to this list) on...
According to a supplier I contacted in China, who spoke directly with SRNE yesterday, there’s currently no stock of HEBP as the product is still in the R&D stage. They plan to apply for the CEC list sometime in the first half of 2025. Has anyone heard anything different, maybe from Borick?
I’m...
Can anyone confirm whether a 10kw / 12kW HESP can be used in a grid-tie configuration without batteries? I’d like to set it up for consumption/export since my utility provider currently offers netting. I plan to add batteries in the future.
Does anyone know how long it typically takes for SRNE inverters to show up on the California Solar Equipment List https://www.energy.ca.gov/programs-and-topics/programs/solar-equipment-lists ?
It does have UL1741-SB certificate from Intertek listed under downloads...
I'm in the process of planning a grid-tied solar system with net metering and would appreciate some advice. Here’s my setup:
Service: 400A
Meter Location: About 200 ft from the house
Generator: 45kW Generac, located near the meter, with two ATS (automatic transfer switches) for two separate...
Agreed! However, I’m not sure if there’s a significantly more economical solution. I’m trying to maximize my municipality’s limit of 25kW AC output, which can be achieved with two 18kPV systems in parallel, as suggested above by @DIYrich. Are there other viable alternatives? For example, Growatt...
24kW of inverter (via two 18kpv's) is plenty for what I have in mind. But you're thinking of the standard generator setup where you tap in before the two ATS's, right? That would shut off my solar when the service goes down and generator fires up. I was hoping that with Gridboss I'd have the...