Hi @MikeNKerri, I'm Jose from the Sol-Ark team. Regarding your question, the Sol-Ark will limit the PV production in different scenarios:
When the inverter is programmed to limit the PV production to only what your loads need. This is when the inverter is programmed in Limited to Home or Load...
Hi @austinhutchins43 , I was reviewing your diagram and noticed that the load outputs of the inverters are separated. If the inverters are configured to operate in parallel, their outputs must also be combined. Additionally, I suggest using a transfer switch, for using grid instead of inverters...
Yes, I know that split phase and 3-Phase are different, what I'm trying to say is that it is possible to program and use only one inverter in 3-Phase by using only 2 of the 3 phases. In this way, you can connect a Sol-Ark to a 3-Phase grid and have 120V (L-N) and 208V (L-L). This applies to...
Hi @glandpuck, adding to your post, it is also possible to do 120/208V with only one Sol-Ark 15K and using two phases from the grid. In this scenario, the parallel communication must not be enabled.