I found that the programming was the same as a single phase Multiplus in that it is programmed through VE Configure computer software. You attach the VE Bus USB dongle to your computer and use the VE Configure computer software to set the parameters based on your battery setup. There are...
Sure - 100 amp ANL feeding the bus bar, and 8 awg from the MPPT to the busbar.
I think I did the calculations correct, but if you see an error I'm open to feedback. Thanks
Recently installed the new MP II in my 5th wheel. 400ah Lithium and 600w of solar panels. Happy with it so far.
Also, I contacted Victron, and for those wondering, it can be installed in just about any orientation. I ended up installing it vertically, but considered a horizontal install.
I'm installing a MP II in my 50 amp RV. The location I am installing into will require that I run an extra length of split phase (4 conductor) wire to my A/C distribution panel. What is the best wire to use. It will all be run inside the RV - Should I just use 4 conductor Romex? Or is there...
Brand new in box. Picked up one of the new MultiPlus II's before I got around to installing this one. I am located in central NC for a local sale, or happy to ship at the buyers expense.
$1050 OBO
I'm a newish member so I'm happy to provide whatever type of verification makes the buyer...