Hello Everyone:
I've got a pair of Multiplus ii (UL) configured for a 240v split phase System (250/100 MPPT, Cerbo S and Lynx Distributor) for which I opted to install the ESS Assistant along with a flag and a couple of relays to control the AC input. The AC input is currently set to kick in...