Tigo provides two lines of products:
This paper does NOT provide instructions on configuration, commissioning and monitoring of the Optimizer system.
Version 2: Corrected several typos and copy/past errors
Version 3: Added information about Blind deployment of Optimizers.
Version 4: Minor formatting and image clean-up
Version 5: Added information on various module models. Updated info on "blind" optimizers
1) Rapid Shutdown Transmitters and receivers.
- Compliance with Rapid Shutdown requirements
- Simple wiring
- No PV optimization
- No Module level data
2) Optimizers, TAPs and CCAs
- Compliance with Rapid Shutdown requirements
- PV optimization
- Panel Level Data Reporting.
This paper does NOT provide instructions on configuration, commissioning and monitoring of the Optimizer system.
Version 2: Corrected several typos and copy/past errors
Version 3: Added information about Blind deployment of Optimizers.
Version 4: Minor formatting and image clean-up
Version 5: Added information on various module models. Updated info on "blind" optimizers