I have decided to use the NEP rapid shutdown system(pvg-4). I am going to use 2 Tigo optimizers on the shaded panels. I have a question on wiring the 2 shaded panel with the tigo's. I assume that I wire the panel to the tigo optimizer first, then, tigo to shutdown unit?