  1. W

    FPL Maximum array size!

    Well that amounted to a big nothing burger. We submitted the county inspection and in ten days got our permission to operate. The only goal to placing the big red warning banner at the top of the application page was to seed doubt and hopefully dissuade people from installing a larger system. Im...
  2. W

    FPL Maximum array size!

    From FPL Net metering application page. "The system production is larger than your annual energy usage. The system size must be reduced prior to FPL approval." I am being told by FPL that my project may not be approved unless I reduce the size of the array. I currently have a whopping 6ea. 330W...
  3. W

    Adding an ESS to Enphase Enlighten System

    This thread went deep quick, glad i’m showing up relatively early. I had the idea years ago to bypass the microinverters when the grid was down with inline mc4 t connectors on the dc panel wiring for off grid use. Then i wondered about a small battery under each panel in parallel with the...
  4. W

    Adding storage to my Enphase system

    re: “Lugs” Yes, this is the better way to do this. Thanks
  5. W

    Adding storage to my Enphase system

    Thanks for that. Seems the PLC is a key part and would probably be my barrier to entry. I like the DC for charging the batteries. If you wanted more than 20A to backfeed the main you could derate your main panel breaker. When off grid how does everything function? I assume the xw uses frequency...
  6. W

    Adding storage to my Enphase system

    Excruciatingly long thread. Can you give guidanice on your system setup?…a one-line diagram of your system? Or simple description? ok, I’ll start looking through the thread again…seems like you’ve made a few changes over time.
  7. W

    Enphase Direction

    Make no mistake, $ENPH is a for profit publicly traded company whose sole purpose is to increase shareholder value. By keeping people inside your ecosystem you maximize profit. I am willing to pay more for a product that seamlessly works with all the other parts of my system with a warranty from...
  8. W

    IQ-8D?

    Interesting…
  9. W

    Enphase is confusing system

    The combiner box is not required for a system to function. The gateway is only required if you want monitoring(I believe) for grid tied only systems. https://enphase.com/store/communication/iq-gateway-and-combiner/commercial-iq-gateway What are the voltages in Finland? Are they wye or delta...
  10. W

    Enphase Direction

    I agree on the portable battery front. I would be very impressed if enphase sent a product to Will for review and constructive criticism.
  11. W

    Enphase is confusing system

    I recommend visiting university.enphase.com for training and certification. This process should answer all your questions.
  12. W

    An Enphase Ensemble Installation

    Did some functional testing by switching off main breaker under similar conditions and system performed flawlessly with no delays. So far we have stayed in self-consumption mode with a 50% discharge limit. Adding batteries made it obvious we need more solar. Thanks for your input Svetz.
  13. W

    An Enphase Ensemble Installation

    Svetz, what settings are you using for your backup mode...self consumption, full backup...? How long does it take to go off grid when the grid fails in each mode? We recently installed one encharge 10t and controller 2. Our first outage this morning while in self consumption mode took 10...
  14. W

    Enphase Sunlight Backup with manual transfer switch

    The reliance manual transfer switch would be redundant to the enphase controller. But how do you expect they world “work with” each other?
  15. W

    Enphase Sunlight Backup with manual transfer switch

    Curious if the reliance transfer switch is on the grid side of the enphase controller or on the load side?
  16. W

    Is there any way to connect an off-the-shelf LiFePo battery to Enphase System Controller

    Does the enphase controller know the difference between an actual generator and a UL listed inverter powered by batteries? Me thinks not. Some day I will connect a battery/inverter to the gen inputs and give it a try.
  17. W

    Enphase battery

    Where did you purchase the equipment? Looking at starting a project in a couple months. Also, it looks like you got the next generation battery. I like the thinner form factor.
  18. W

    What I'm learning about DIY Enphase and Hoymiles Microinverters

    It’s not hard to get certified at the enphase university.
  19. W

    Enphase battery

    Your first install needes to be overseen or checked by enphase. I am also certified but have yet to install my first battery. How was it working with enphase for this final step? Thanks!
  20. W

    An Enphase Ensemble Installation

    With the threat of added costs for solar producers from the utilities i bet we will see increased desire to go completely off grid. Two way EV chargers may be a large part of the solution. Although an EV is an energy hog and may require a grid connection for some. I wish enphase would make the...
  21. W

    An Enphase Ensemble Installation

    Could you hack an Enphase system? Would you choose ensemble and Encharge again? A diy system would be much cheaper but would it be as good…?
  22. W

    Enphase IQ8 Microinverters Ready for Prime Time

    4IQ 10T batteries in parallel is 40kWh and 15.36kW continuous and 23kW peak output. What would you like to power?
  23. W

    Dip in production, midday, causes?

    They probably raised the taps on the transformer. Raising the taps lowers the voltage. Ask the neighbor if they remember having a power outage associated with the work they did to “fix” the issue. Changing the voltage taps require the transformer to be deenergized
  24. W

    Enphase IQ8 Microinverters Ready for Prime Time

    Some properties/electric service is only 120/208V. I thought it was interesting they aren’t making an IQX variant (96 cell)
  25. W

    Get certified to install Enphase IQ8, IQ Battery and IQ Controller

    University.Enphase.com You will need an enlighten login. Certification is required by Enphase to initialize a system that has batteries or the IQ Controller. If you already have an enphase system you can log in with the same credentials.
  26. W

    Do I really need a dedicated breaker for Enphase IQ Envoy?

    Here is another option. A 240v 20A four position double breaker.
  27. W

    Need help avoiding a mistake-Enphase

    Those panels are 96 cell modules and will require an IQ 7X microinverter. Use the Enphase module compatibility calculator tool. The IQ 7X microinverters will work with the new IQ controller to power in your home off grid. But I believe you will need a battery and also will need to pay attention...
  28. W

    Enphase IQ8 Microinverters Ready for Prime Time

    Yes! https://www.google.com/search?q=enphase+iq8&client=safari&hl=en-us&source=lnms&tbm=shop&sa=X&ved=2ahUKEwih6Prh4fz0AhV0kWoFHYiCBdUQ_AUoAnoECAEQBA&biw=1180&bih=708&dpr=2
  29. W

    Enphase IQ8 Microinverters Ready for Prime Time

    They use a smart transfer switch that aggregate solar, battery, generator, loads/load-control, grid into one device. With the use of current transformers, very fast switching and power flow control they can always keep power on.
  30. W

    Dip in production, midday, causes?

    Cold weather can make the problem worse due to higher output from panels. The amount of power actually lost will be negligible over time.
  31. W

    Dip in production, midday, causes?

    Voltage rise in the IQ Cable can be a problem. All Enphase inverters are connected in parallel on the AC wiring. Care should be taken in the planning stage to prevent voltage rise in highly populated parallel strings of inverters. For example if the junction box on the roof is at one end or the...
  32. W

    Owner-Builder DIY, Enphase, Iron Ridge, Florida

    I have been taking all the on demand classes available at no cost. Also they recently updated the training to include their latest products; IQ8 pv inverter, IQ battery 3T and 10T, combiner 4, and IQ Controller 2. The new battery is the same energy and power but a different form factor. @7.4” it...
  33. W

    Owner-Builder DIY, Enphase, Iron Ridge, Florida

    Images of Proposed Ensemble Installation and Single Line Diagram. (some information excluded from single line)
  34. W

    Owner-Builder DIY, Enphase, Iron Ridge, Florida

    Ensemble Training: I have recently been getting certified to install the Ensemble and Encharge battery backup system from Enphase University. If you have an enlighten login you can sign in and request approval to enroll in any of the Enphase training courses. So far i have taken the Enphase...
  35. W

    Owner-Builder DIY, Enphase, Iron Ridge, Florida

    Update 9/24/2001 We are a year and a half into the 2kw pv install. We initially installed a system that met roughly half of our consumption needs. First year we: Produced 3400kWh Consumed 6600kWh (consumption metering is awesome) Consumption metering allowed us to see that our ac system...