In my system I have 2 banks of 4 Chins 12v 100ah batteries. The Chins manuals specify a 50A charging limit (set, I presume, by the BMS). Here's my question:
Since I have two of these banks in parallel, can I push 100A to the battery system? Or do I need to stick to the 50A across the whole...