Hi all
Have 3 x 280ah @ 24v batts ready to get connected
All matched and batched A Grade Amy cells
Each with its own 200 amp JBD BMS and bluetooth
One BMS turned up without the module and its being sent, but xmas delays means it aint here yet and wont be for a while
and I need to get these batteries in and running as the AGMs are near shot.
Was thinking, as 2 of the 3 batteries has been charged up and ready to go, could I take the module out of 1 of the BMS, fit it to the 3rd, get it charged up and then install all 3 batteries?
Sure I wont be able to monitor that one battery, less than ideal but as they were matched and batched A Grade Amy cells I would like to think all will be good and when the module arrives I can fit it then.
OR
Should I just install the two with the module in (its enough to run the boat) and install the 3rd at a later date?
Have 3 x 280ah @ 24v batts ready to get connected
All matched and batched A Grade Amy cells
Each with its own 200 amp JBD BMS and bluetooth
One BMS turned up without the module and its being sent, but xmas delays means it aint here yet and wont be for a while
and I need to get these batteries in and running as the AGMs are near shot.
Was thinking, as 2 of the 3 batteries has been charged up and ready to go, could I take the module out of 1 of the BMS, fit it to the 3rd, get it charged up and then install all 3 batteries?
Sure I wont be able to monitor that one battery, less than ideal but as they were matched and batched A Grade Amy cells I would like to think all will be good and when the module arrives I can fit it then.
OR
Should I just install the two with the module in (its enough to run the boat) and install the 3rd at a later date?