I am thinking to add a 3' walkway gap to my install since my available roof space allows for it and it wont change the qty of the rail-less mounts i already have. Each row is in series.
So i have four #10 PV across each gap - perhaps I use two conduit for UV and step protection to bridge the new gaps.
If the conduit is long enough for ends to be under the panels by 2 to 3" - is there any special gland needed for code compliance to seal the conduit pipe ends?
Any other suggestions?
So i have four #10 PV across each gap - perhaps I use two conduit for UV and step protection to bridge the new gaps.
If the conduit is long enough for ends to be under the panels by 2 to 3" - is there any special gland needed for code compliance to seal the conduit pipe ends?
Any other suggestions?