I'll share what worked for my setup. I have a cabinet with a mix of EG4-LL, EG4 LL-S, and several EG4 LifePo4 V1.
- Updated Multipack Firmware across all batteries.
- EG4-LL-S as ID 1 (Master)
- Use CAN connection on EG4-LL-S to EG4 6000XP
- Standard straight Cat5E patch cables between batteries & 6000XP inverter.
IMPORTANT: Perform Cold-Start, Completely Shutdown Inverter and Batteries
- Power on EG4-LL-S Battery ID 1 (Master)
- Power on Rest of Batteries in order
- Wait a couple minutes
- Power on EG4 Inverter
- Wait a few minutes, the EG4 6000XP will report 100ah single batt, then report correct ah total several minutes later.