I’m possibly looking at grid boss, flex boss system just as a buffer for short power outages.
My thought is I can run different loads off the smart ports so I don’t overload the system
What have others done?
Solar may come latter but not initially.
Possible load requirement would be about 8Kmax peak. But not for hours and hours.
My thought is I can run different loads off the smart ports so I don’t overload the system
What have others done?
Solar may come latter but not initially.
Possible load requirement would be about 8Kmax peak. But not for hours and hours.