This past weekend I noticed I had some mold starting on the eave on the low side of the roof:

So I went ahead and ordered a 25x45 60 mil EPDM for the roof and went to Lowe's and picked up 58 sheets of 1" insulation foam boards:

I'm doing a hot roof, that that will go down first, followed by the EPDM. Still researching the correct adhesive to use, and hope to get that ordered tomorrow.
Also had this guy show up today:

Got a couple of extra connectors to make my own paralleling cables:

Ready for deployment:

But priority one is to get the roof done. Something I have been putting off as I thought the tarp would keep everything nice and dry, but I was wrong.

So I went ahead and ordered a 25x45 60 mil EPDM for the roof and went to Lowe's and picked up 58 sheets of 1" insulation foam boards:

I'm doing a hot roof, that that will go down first, followed by the EPDM. Still researching the correct adhesive to use, and hope to get that ordered tomorrow.
Also had this guy show up today:

Got a couple of extra connectors to make my own paralleling cables:

Ready for deployment:

But priority one is to get the roof done. Something I have been putting off as I thought the tarp would keep everything nice and dry, but I was wrong.