Thinking about 24 volt system for a Northern Wisconsin cabin.
For power to fridge, sun mar toilet, maybe small on demand pump for cistern.
800 to 1000 watts of panels. Maybe all in one inverter charge controller. Batteries to be determined.
Will have gas generator available for backup for stretches of sunless periods.
Thinking Mpp for all in one and Battle Born batteries.
Trying to keep costs below 10k for total system. Thoughts?
For power to fridge, sun mar toilet, maybe small on demand pump for cistern.
800 to 1000 watts of panels. Maybe all in one inverter charge controller. Batteries to be determined.
Will have gas generator available for backup for stretches of sunless periods.
Thinking Mpp for all in one and Battle Born batteries.
Trying to keep costs below 10k for total system. Thoughts?