To answer your question, I'll assume a 48V system.
I will also assume you mean 60000Wh (really, really big) and not 60000KWh (Grid scale)
2 x 120 = 240A.
If we assume an average voltage of 53.6V, then a 60,000Wh battery would have 60,000Wh/53.6V=1119Ah
To charge a 1119Ah battery from empty to full with 240A will take 1119Ah/240A=4.664 hours
What are you building the system for? The numbers are huge.