Just built a 12 volt battery with 4 3.2 v cells for 280 ah.
I plan first running from the solar panels thru my solar charge controller then to the BMS 4s. My question is: If the battery doesn't keep up with the load can I charge the battery with a lead acid charger? Do I need to disconnect the BMS first?
I plan first running from the solar panels thru my solar charge controller then to the BMS 4s. My question is: If the battery doesn't keep up with the load can I charge the battery with a lead acid charger? Do I need to disconnect the BMS first?