Hello,
Friends I will ask for your help with this issue :
We have one Deye 20kW LV Hybrid 3 Phase inverter at our installation and our customer would like to buy another 50kW High Voltage Hybrid 3 Phase. As a good PV installing company we need to think up something which will work together, because he really likes brand Deye. So if you understand me, I need to come up with some solution.
I would like to ask for your help with these options:
Important: customer installation is OFF-Grid with Diesel generator use if necessary
1. Can we connect 20kW LV Deye to the GEN port of the 50kW HV Deye. 20kW LV Deye will work as a smart Load. So panels and batteries after charge will produce extra AC to the GEN port and 50kW Deye can charge batteries and also Load consumption.
- so we will plug the Load port from 20kW Deye to the GEN port of 50kW HV Deye.
Is this possible ?
2. We will make an AC couple from 20kW Deye to 50kW HV Deye. So we will connect 20kW Deye as On-Grid (but with batteries) to the main distribution board and CT devices with Zero power to Grid - No Grid export.
What do you mean ?
Thank you very much for advice which will really help us.
(Customer had already bought 50kW HV Deye, so he can not use for example 5 parrarel 20kW LV Deye)
Thank you very much !
David
Friends I will ask for your help with this issue :
We have one Deye 20kW LV Hybrid 3 Phase inverter at our installation and our customer would like to buy another 50kW High Voltage Hybrid 3 Phase. As a good PV installing company we need to think up something which will work together, because he really likes brand Deye. So if you understand me, I need to come up with some solution.
I would like to ask for your help with these options:
Important: customer installation is OFF-Grid with Diesel generator use if necessary
1. Can we connect 20kW LV Deye to the GEN port of the 50kW HV Deye. 20kW LV Deye will work as a smart Load. So panels and batteries after charge will produce extra AC to the GEN port and 50kW Deye can charge batteries and also Load consumption.
- so we will plug the Load port from 20kW Deye to the GEN port of 50kW HV Deye.
Is this possible ?
2. We will make an AC couple from 20kW Deye to 50kW HV Deye. So we will connect 20kW Deye as On-Grid (but with batteries) to the main distribution board and CT devices with Zero power to Grid - No Grid export.
What do you mean ?
Thank you very much for advice which will really help us.
(Customer had already bought 50kW HV Deye, so he can not use for example 5 parrarel 20kW LV Deye)
Thank you very much !
David