When the grid goes down they stop backfeeding the main grid tie panel so that should be fine.
The way my house is setup, there is a 200A solar ready eaton main panel thats grid tied. And the house has its own 100A sub panel, and garage has its own 100A subpanel, and anotner 100A subpanel for pool equipment. The 200A solar ready eaton panel feeds all the smaller 100A panels.
And theres another 200A grid tied main panel with 2nd power meter for water well pumps.The well setup has grid tied micro inverter solar array.
The main panel feeding the house/garage/pool has a sol ark12k. I want to put the 2nd sol ark on this panel and have its critical load be the house. The existing solark12k has the garage subpanel as the critical load.
The reason I dont want them synchronized is 1.) I may want to use different battery types on each inverter. 2.) If things go badly, I want to be able to pull one inverter and use it to run the well setup in case of emergency only. We live in a fire zone and power does get cut.