Randman
New Member
I have a 400 amp service to our fairly large house. I have ordered a system with the 18Kpv unit and 14kwh wall battery. I know the 18Kpv has a 200 amp limit.
So I'm planning to create a 200 amp sub panel with specified circuits that would work under that limit. And then connect the inverter directly to that sub panel. The remaining circuits would remain on the 400 amp main panel and be fed only by the grid for now.
Does this sound like it will work?
So I'm planning to create a 200 amp sub panel with specified circuits that would work under that limit. And then connect the inverter directly to that sub panel. The remaining circuits would remain on the 400 amp main panel and be fed only by the grid for now.