Marobel
New Member
So the EG4 server rack battery is up and running on SA, the 8 - 545W panels are up and pumping power into the now fully charged batteries. Now it’s time to design and install the AC output into my shop. I’m looking for a sanity check on this next phase.
I would like to separate the 240V split phase AC into 2 - 120V isolated circuits to run the shop lights, dust collection. I would also like to have at least one plug for a 220V to run a new tablesaw. (I can wire this for 120V but will lose power doing so.
From the L1, L2, N and Ground terminals on the 6000XP, how could I do this?
(Asking for a friend
)
@timselectric
I would like to separate the 240V split phase AC into 2 - 120V isolated circuits to run the shop lights, dust collection. I would also like to have at least one plug for a 220V to run a new tablesaw. (I can wire this for 120V but will lose power doing so.
From the L1, L2, N and Ground terminals on the 6000XP, how could I do this?
(Asking for a friend

@timselectric