Hi, I've made a few adjustments and believe ready to submit to Greenlancer for permit creation.
* Inverter: EG4 FlexBOSS 21 Inverter & EG4-GridBOSS
* Rapid shutdown: Tigo TS4-A-O devices with Tigo CCA and Tigo TAP
* Battery: 2 16KW Ruixu
* Panels: 25x 455W TOPCon Canadian Solar (11.4kw)
* Racking: S-5-N 1.5 clamps onto 1.5" standing seam ribs
IronRidge XR100 Rails with L-foot brackets connected to S-5 clamps
* Safety Switch : ABB 200 Amp 240-Volt Non-Fused Outdoor General-Duty Safety Switch (TGN3324R)
String layout:
* East face: 1 string of 5 panels
* South face: 2 strings of 7 panels (these 2 would share 1 MPPT)
* West face: 1 string of 6 panels
Conduit runs- I was planning on asking them to have them draw it under the panels so less visible, such as the run from the east array to west face.
This will be a grid-tie system with Oklahoma PSO
Wondering if looks good or anything else I should change or ask for.
Thanks!
* Inverter: EG4 FlexBOSS 21 Inverter & EG4-GridBOSS
* Rapid shutdown: Tigo TS4-A-O devices with Tigo CCA and Tigo TAP
* Battery: 2 16KW Ruixu
* Panels: 25x 455W TOPCon Canadian Solar (11.4kw)
* Racking: S-5-N 1.5 clamps onto 1.5" standing seam ribs
IronRidge XR100 Rails with L-foot brackets connected to S-5 clamps
* Safety Switch : ABB 200 Amp 240-Volt Non-Fused Outdoor General-Duty Safety Switch (TGN3324R)
String layout:
* East face: 1 string of 5 panels
* South face: 2 strings of 7 panels (these 2 would share 1 MPPT)
* West face: 1 string of 6 panels
Conduit runs- I was planning on asking them to have them draw it under the panels so less visible, such as the run from the east array to west face.
This will be a grid-tie system with Oklahoma PSO
Wondering if looks good or anything else I should change or ask for.
Thanks!