Gridboss/flexboss/ruixu system check before submitting to greenlancer for permit

OkieSolie

New Member
Joined
Dec 16, 2022
Messages
16
Hi, I've made a few adjustments and believe ready to submit to Greenlancer for permit creation.

* Inverter: EG4 FlexBOSS 21 Inverter & EG4-GridBOSS
* Rapid shutdown: Tigo TS4-A-O devices with Tigo CCA and Tigo TAP
* Battery: 2 16KW Ruixu
* Panels: 25x 455W TOPCon Canadian Solar (11.4kw)
* Racking: S-5-N 1.5 clamps onto 1.5" standing seam ribs

 IronRidge XR100 Rails with L-foot brackets connected to S-5 clamps
* Safety Switch : ABB 200 Amp 240-Volt Non-Fused Outdoor General-Duty Safety Switch (TGN3324R)

String layout:
* East face: 1 string of 5 panels
* South face: 2 strings of 7 panels (these 2 would share 1 MPPT)
* West face: 1 string of 6 panels

Conduit runs- I was planning on asking them to have them draw it under the panels so less visible, such as the run from the east array to west face.

This will be a grid-tie system with Oklahoma PSO


Wondering if looks good or anything else I should change or ask for.


Thanks!
 

Attachments

  • RoofArray.png
    RoofArray.png
    304.2 KB · Views: 26
  • garage battery area with Inverter.jpg
    garage battery area with Inverter.jpg
    182.8 KB · Views: 28
  • MeterArea Front View.jpg
    MeterArea Front View.jpg
    179.1 KB · Views: 31
  • MeterAreaWide.png
    MeterAreaWide.png
    1.7 MB · Views: 27
Last edited:
Im thinking now to not do the tigo optimizers TS4-A-O, but just do the ones with rapid shutdowns TS4-A-F. Then would no longer need the CCA and TAP access point.

Part of my reasoning for originally thinking Tigo TS4-A-O is if a panel has an issue would be nice to identify it. In this other thread though another poster mentioned can use a thermal camera to identify a problematic panel. Which that is probably good enough for me, and I like how it simplifies the system a bit.

 
Last edited:
I think I'm going to go with the eg4 battery instead

From my research Tulsa uses NEC 2018 which doesn't require ul 9540

...but they do use International Fire Code 2018, which looks like it does require ul 9540. My understanding this is a system level cert, and the ruixu battery was certified with their rx-12, not the flexboss currently. Also thinking for home insurance insurability having the ul cert would be a good thing

update: I fully submitted everything to greenlancer, wish me luck!
 

Attachments

  • EG4 Battery and inverter area garage.jpg
    EG4 Battery and inverter area garage.jpg
    190.9 KB · Views: 13
Last edited:
I think I'm going to go with the eg4 battery instead

From my research Tulsa uses NEC 2018 which doesn't require ul 9540

...but they do use International Fire Code 2018, which looks like it does require ul 9540. My understanding this is a system level cert, and the ruixu battery was certified with their rx-12, not the flexboss currently. Also thinking for home insurance insurability having the ul cert would be a good thing

update: I fully submitted everything to greenlancer, wish me luck!