Is this plan safe and good to go?
2 100 watt panels ran in series on roof - 15amp inline fuse (mc4 kind for both) - 10awg wire through roof - disconnect swtich - 20a MPPT charge controller- 10 awg wire - 20amp inline fuse - to 250 amp bus bar
panel to controller less than 10feet
controller to bus bar less than 1 foot
2000w inverter - 2awg wire that came with inverter to bus bar (I have read use the wire that comes with inverter but I have also read 2000w should have 1/0 awg)
less than 2 feet
12v fuse box - 12gauge to bus bar
less than 2 feet
I am running all wires above to bus bar then from bus bar to battery
250 amp red bus bar - 2 awg 250 amp inline fuse - disconnect swtich - battery
250 amp black bus bar - 2 awg - shunt - battery
less than 2ft total
battery is 100 amp agm
THANKS!!!!
2 100 watt panels ran in series on roof - 15amp inline fuse (mc4 kind for both) - 10awg wire through roof - disconnect swtich - 20a MPPT charge controller- 10 awg wire - 20amp inline fuse - to 250 amp bus bar
panel to controller less than 10feet
controller to bus bar less than 1 foot
2000w inverter - 2awg wire that came with inverter to bus bar (I have read use the wire that comes with inverter but I have also read 2000w should have 1/0 awg)
less than 2 feet
12v fuse box - 12gauge to bus bar
less than 2 feet
I am running all wires above to bus bar then from bus bar to battery
250 amp red bus bar - 2 awg 250 amp inline fuse - disconnect swtich - battery
250 amp black bus bar - 2 awg - shunt - battery
less than 2ft total
battery is 100 amp agm
THANKS!!!!