Hi everyone,
I’m experiencing an integration issue between my Seplos BMS and an SMA Sunny Island inverter (model S18.0H-13). During startup, the inverter displays a “section switch is not open” error, despite following the recommended startup sequence.
Here are my BMS details:
• Manufacturer: CAN:SMA SOFAR
• Software Version: 16.6
• Part Model: 1101-SP76
• Protocol Version: 2.0
The Battery Monitor software is set to “CAN:SMA SOFAR.” I suspect that the firmware or protocol might be causing miscommunication with the inverter. Has anyone encountered a similar issue? Should I be using a different protocol setting, or is there a firmware update available that could help resolve this error? Any troubleshooting tips or advice would be greatly appreciated.
Thanks in advance!

I’m experiencing an integration issue between my Seplos BMS and an SMA Sunny Island inverter (model S18.0H-13). During startup, the inverter displays a “section switch is not open” error, despite following the recommended startup sequence.
Here are my BMS details:
• Manufacturer: CAN:SMA SOFAR
• Software Version: 16.6
• Part Model: 1101-SP76
• Protocol Version: 2.0
The Battery Monitor software is set to “CAN:SMA SOFAR.” I suspect that the firmware or protocol might be causing miscommunication with the inverter. Has anyone encountered a similar issue? Should I be using a different protocol setting, or is there a firmware update available that could help resolve this error? Any troubleshooting tips or advice would be greatly appreciated.
Thanks in advance!