MJSullivan
New Member
- Joined
- Jul 16, 2021
- Messages
- 40
I have an Outback FPR-4048 which I hope to commission before the end of the year. My basement space is VERY tight with low ceilings and little wall space. The output will be 60A distributed over 5 critical loads. I hope to double that over the years by adding more batteries and inverters -- hence the total output goal of 125A. One layout that would "fit" my space would be to use two small 8"x11" 120V subpanels turned on their sides instead of one "normal" 240V subpanel (see attached illustration). Is this allowed by the NEC?
Thanks
Michael
Thanks
Michael