Danny
Solar Enthusiast
- Joined
- Sep 21, 2019
- Messages
- 223
Could I hook 2 Modified sign wave inverters to Line 1 and Line 2 after disconnecting the grid with enphase iq 7+ inverters if I was willing to dump load using a heater. Or do you all know a simple way to phase sift to dump production. I know the enphase inverters need to be regulated when my battery / loads are not taking all the production. I was thinking about using moving blankets to kill production. I'm just thinking about a Armageddon plan B. The only plan B i have now is to bypass the enphase inverters and route the DC to inverter / chargers to run my refrigeration. I have 7 x 385w on the roof. Time is running out to order anything do do the DC coupling but I do have 2 x 1500 watt inveters. I have no 220 loads.
Last edited: