We need a battery backup for the glue pot on a banding machine. PG&E is saying that we will have many blackouts this summer and when we get one it is time consuming to clean out the glue pot.
We need a battery bank that would provide 45 minutes of 5,500 watts at 230V and 1,500 watts at 110V through an inverter/ATS.
Is there anyone on this forum that can provide us with a system that would meet these specifications. Ken
We need a battery bank that would provide 45 minutes of 5,500 watts at 230V and 1,500 watts at 110V through an inverter/ATS.
Is there anyone on this forum that can provide us with a system that would meet these specifications. Ken