Is a "Zero Export" agreement available? i.e. they know you're doing it, but you don't place any load on their wires or transformers?
That could be processed quickly, unlike, "you can connect after we get around to replacing the fully loaded transformer" as some have been told.
What we guerillas need is a spec for what smart meter reports. Does it log and report net export over one cycle of 60 Hz? Over one second or minute?
Non-1.0 PF loads like capacitor or inductor (including transformer with no load on secondary) export power for 1/4 of a cycle. VFD with regenerative braking and elevators can export for a period of time.
The question is what we can get away with.
That could be processed quickly, unlike, "you can connect after we get around to replacing the fully loaded transformer" as some have been told.
What we guerillas need is a spec for what smart meter reports. Does it log and report net export over one cycle of 60 Hz? Over one second or minute?
Non-1.0 PF loads like capacitor or inductor (including transformer with no load on secondary) export power for 1/4 of a cycle. VFD with regenerative braking and elevators can export for a period of time.
The question is what we can get away with.