wim.dewulf
New Member
I ordered a MOES Dual Power Controller 50A 5500 Watt Automatic Transfer Switch for Off Grid Solar Wind System ATS DC 12V 24V 48V AC 110V 220V.
Normally you have to connect the public power to the controller.
I wonder if you could connect the V2L of the KIA EV6 (3.4 KW, 220V) in stead of the public power. If this would be possible, I can go completely off grid.
Any ideas?
Normally you have to connect the public power to the controller.
I wonder if you could connect the V2L of the KIA EV6 (3.4 KW, 220V) in stead of the public power. If this would be possible, I can go completely off grid.
Any ideas?