MPP LV6548 Build

DanF

Solar Enthusiast
Joined
Nov 26, 2020
Messages
124
Location
Ohio
Starting the build.. 16-272a Lifepo4 cells, 2- MPP LV6548 Inverters in 240v operation. Solar TBD...IMG_20210115_165828.jpg
 

Attachments

  • IMG_20210115_184605.jpg
    IMG_20210115_184605.jpg
    59 KB · Views: 105
  • IMG_20210116_094248 1.jpg
    IMG_20210116_094248 1.jpg
    76.9 KB · Views: 106
  • IMG_20210116_190245.jpg
    IMG_20210116_190245.jpg
    71.1 KB · Views: 105
Updated pictures.. Made some changes to the PVC so all of the 120/240v wiring will be out of site on the wall once it is finished. She's ready for Plywood!
 

Attachments

  • IMG_20210117_153449.jpg
    IMG_20210117_153449.jpg
    59.2 KB · Views: 111
  • IMG_20210117_155947.jpg
    IMG_20210117_155947.jpg
    74.6 KB · Views: 107
  • IMG_20210117_155952.jpg
    IMG_20210117_155952.jpg
    85.1 KB · Views: 98
  • IMG_20210117_160004.jpg
    IMG_20210117_160004.jpg
    87.7 KB · Views: 101
  • IMG_20210117_160012.jpg
    IMG_20210117_160012.jpg
    79.8 KB · Views: 106
Got a much needed break to work on other home issues! My second inverter has not been shipped (back order issues) and the batteries are currently on the slow boat to a fedex destination in Cali. This will give me time to configure the battery and solar side of the build as well as complete the branch circuit conduits and tie-ins to the main panel. So, here is how it stands for a bit... Pics below
 

Attachments

  • IMG_20210119_190237.jpg
    IMG_20210119_190237.jpg
    69.1 KB · Views: 111
  • IMG_20210119_190308.jpg
    IMG_20210119_190308.jpg
    77.1 KB · Views: 104
  • IMG_20210119_205344.jpg
    IMG_20210119_205344.jpg
    68.6 KB · Views: 113
  • IMG_20210120_174331.jpg
    IMG_20210120_174331.jpg
    73.8 KB · Views: 120
  • IMG_20210120_174405.jpg
    IMG_20210120_174405.jpg
    56.2 KB · Views: 114
Commissioning Batteries! They arrived earlier than expected. Sub-panel work, conduits, painting "The wall"etc.
 

Attachments

  • IMG_20210210_003631.jpg
    IMG_20210210_003631.jpg
    78.6 KB · Views: 196
  • IMG_20210202_164624.jpg
    IMG_20210202_164624.jpg
    88.4 KB · Views: 190
  • IMG_20210207_144043.jpg
    IMG_20210207_144043.jpg
    107.9 KB · Views: 177
  • IMG_20210203_141947.jpg
    IMG_20210203_141947.jpg
    78.1 KB · Views: 188
  • IMG_20210207_104909.jpg
    IMG_20210207_104909.jpg
    140 KB · Views: 184
  • IMG_20210202_164634.jpg
    IMG_20210202_164634.jpg
    78.3 KB · Views: 202
Commissioning Batteries! They arrived earlier than expected. Sub-panel work, conduits, painting "The wall"etc.
Wow, very clean install! Are your batteries/terminals all in new/grade A condition?
 
Wow, very clean install! Are your batteries/terminals all in new/grade A condition?
They appear to be. No marks at all. They have stickers with all battery info and bar coded. I am very pleased with the professional packaging as well. These also have small rods with nuts instead of bolts for terminations. Lishen brand.
 
They appear to be. No marks at all. They have stickers with all battery info and bar coded. I am very pleased with the professional packaging as well. These also have small rods with nuts instead of bolts for terminations. Lishen brand.
Have you had the chance to check the individual capacity of these Lishen 272ah cells? I'm planning to build a similar system and these are looking good.
 
Have you had the chance to check the individual capacity of these Lishen 272ah cells? I'm planning to build a similar system and these are looking good.
No, I currently have two parallel banks of 8 cells that I am top balancing. I will do a capacity test for the whole bank of 16 once they are done. I still have to figure out what I am going to put the batteries in. Thinking about a Nema 4 box with all the batteries and DC stuff connected inside that. We'll see..
 
Batteries are balanced. Starting A.C. terminations in the J.B. Finishing some terminations on the A.C. side and beginning to build the battery box and start work on the D.C. side. Terminations from the Main panel to the J.B. still need done as well as installing the 60a breaker.
 

Attachments

  • IMG_20210213_173305.jpg
    IMG_20210213_173305.jpg
    114.7 KB · Views: 198
  • IMG_20210215_145544.jpg
    IMG_20210215_145544.jpg
    92.5 KB · Views: 184
  • IMG_20210216_170853.jpg
    IMG_20210216_170853.jpg
    66.4 KB · Views: 192
  • IMG_20210216_161203.jpg
    IMG_20210216_161203.jpg
    85.8 KB · Views: 197
  • IMG_20210216_163559.jpg
    IMG_20210216_163559.jpg
    83.6 KB · Views: 203
Some new parts arrived today! I am VERY happy with the quality of these VTE 3 point bus bars (1/4" thick) and the VTE class T fuse holder!! They shipped very quickly from their main U.S. website . Going with the Blue Sea 350a continuous battery disconnect switch. Many places are back ordered with these kind of parts..

1. VTE 3 point bus bars $16.75 each
2. T-Shaped protective cover for bus bars $1.80 each
3. Class T fuse holder $9.04

Shipping for the VTE stuff $14.63

4. Blue Sea 350a battery disconnect switch Ebay - $42.10/ $55.95 with tax and shipping.
 

Attachments

  • Screenshot_20210217-193042.jpg
    Screenshot_20210217-193042.jpg
    76.2 KB · Views: 86
  • IMG_20210220_131040.jpg
    IMG_20210220_131040.jpg
    192.1 KB · Views: 68
  • IMG_20210220_131112.jpg
    IMG_20210220_131112.jpg
    135.7 KB · Views: 67
  • IMG_20210220_131118.jpg
    IMG_20210220_131118.jpg
    188.5 KB · Views: 77
  • IMG_20210219_134959.jpg
    IMG_20210219_134959.jpg
    71.4 KB · Views: 84
Beginning the DC side install. Made some bus bars, and began mounting and terminating inside the battery box. Ran out of 4/0 lugs, so I'll work on a good spot for the battery equalizer location until I get some more lugs.
 

Attachments

  • IMG_20210220_173815.jpg
    IMG_20210220_173815.jpg
    134.7 KB · Views: 126
  • IMG_20210220_174007.jpg
    IMG_20210220_174007.jpg
    104.2 KB · Views: 114
  • IMG_20210220_213505.jpg
    IMG_20210220_213505.jpg
    74.3 KB · Views: 115
  • IMG_20210220_214855.jpg
    IMG_20210220_214855.jpg
    60.4 KB · Views: 128
  • IMG_20210220_201123.jpg
    IMG_20210220_201123.jpg
    48.2 KB · Views: 129
Are you going off grid completely/tie-grid or? Very excited to see finished product. Where did you get your copper?
 
Are you going off grid completely/tie-grid or? Very excited to see finished product. Where did you get your copper?
I will not be completely off grid. This will be grid assisted. I am monitoring the sub panel with a Myeyedro electricity monitor which I had on my mains for the past 4 years flawlessly. The Myeyedro is an excellent way to help determine sizing of a system, monitor your watts, amps, costs etc. You can turn on any load and within a second or two you can see how much draw it has.

I currently have all lighting circuits, security panel, 4 security cameras, the furnace, 3 T.V.'s, a refrigerator and my office computer on the sub panel. (about 95% of what I use daily in the house). With everything running at the same time I am drawing 2KW. I am saving head room for the A.C. (soft start) in the summer and will go from there.

Just at night (for the winter months) 8pm-8am the savings should be around 30%, then adding in the 12hrs during the day with proper solar panel sizing I am hoping to save another 40% with a goal of 70% overall.
Summer months will see a higher rate of savings. I will post true results at a later date.

I bought the copper (1/4"x 3/4") at McMaster-Carr. 1-6' piece was perfect for 16 cells. I ended up with 4 extra bus bars. $67.00 for the bus bar with a total of $96.00 after tax and shipping.
 
Last edited:
I couldn't help myself... everything arrived today except for the fuse.. I put a "fusible link" in. I had to see them light up! WOW, THIS IS SOOOO COOL! Running a true capacity test now... Boy, those LED's are pretty.. :giggle:
 

Attachments

  • IMG_20210221_084758.jpg
    IMG_20210221_084758.jpg
    77.3 KB · Views: 146
  • IMG_20210222_122142.jpg
    IMG_20210222_122142.jpg
    40 KB · Views: 152
  • IMG_20210222_195412.jpg
    IMG_20210222_195412.jpg
    63.3 KB · Views: 158
  • IMG_20210222_224813.jpg
    IMG_20210222_224813.jpg
    69 KB · Views: 162
  • IMG_20210222_230539.jpg
    IMG_20210222_230539.jpg
    75.4 KB · Views: 149
  • Screenshot_20210222-232335.jpg
    Screenshot_20210222-232335.jpg
    45.1 KB · Views: 150
I will be putting the DC cables from the inverters to the battery box in either panduit or home made box-outs to conceal them. Not sure on that yet. Now I need to begin sourcing the solar panels. I think the setup will be 2-banks of 6 in series (South facing) then 1- bank of 2 East and 2 West facing in series. Total of 16 panels approx. 300 watts each.
 
Very nice looking setup!, congrats!

How noisy are the 6548's?, do you like them so far?

PD: Can you backfeed to the grid with those inverters?, assuming they get their UL approved.
 
Very nice looking setup!, congrats!

How noisy are the 6548's?, do you like them so far?

PD: Can you backfeed to the grid with those inverters?, assuming they get their UL approved.
No backfeeding the grid and I would never have a grid tied system these days. I.E. deduct metered. F - the power company. And I have a backup generator which is a bonus. Most pay about 10k for that alone and may use it twice in 10 years around here
 