Hello,
In my current 12 volt AGM setup I use system buss bars. Everything is connected to them, battery bank, inverter, 2 charge controllers, fuses, shunt and some 12 volt loads. If I have 16 cells 4S4P LiFePO4 with a BMS for each 4S. I'm wondering if there is any reason I could not just hook up each BMS and the 4 Positives to the buss bars?
I'm trying to figure out the best way to wire 4 BMS's in parallel.
Thanks
Jerry
In my current 12 volt AGM setup I use system buss bars. Everything is connected to them, battery bank, inverter, 2 charge controllers, fuses, shunt and some 12 volt loads. If I have 16 cells 4S4P LiFePO4 with a BMS for each 4S. I'm wondering if there is any reason I could not just hook up each BMS and the 4 Positives to the buss bars?
I'm trying to figure out the best way to wire 4 BMS's in parallel.
Thanks
Jerry