Notes:
1: This is an off-grid setup what will act as a backup "generator" of sorts for critical loads on my manual transfer-switch subpanel.
2: Wiring of the 50 Amp generator inlet box with manual transfer-switch subpanel has been previously done with a master electrician 2 years ago. I've used it a couple of times with my generator during power outages.
3: Worried about grounding. First of the Solar panels, should it really be grounded at the AC subpanel of the shed? Second: Whether the 50Amp cord is sufficient to link to the system ground?
Please advice
1: This is an off-grid setup what will act as a backup "generator" of sorts for critical loads on my manual transfer-switch subpanel.
2: Wiring of the 50 Amp generator inlet box with manual transfer-switch subpanel has been previously done with a master electrician 2 years ago. I've used it a couple of times with my generator during power outages.
3: Worried about grounding. First of the Solar panels, should it really be grounded at the AC subpanel of the shed? Second: Whether the 50Amp cord is sufficient to link to the system ground?
Please advice