Hey all!
Attached is a diagram of my system.
I have all the components in hand except one of the charge controllers.
I'm thinking that i may have to change it up but calculating the solar charge controller needs is making my head spin when trying to factor for the temperatures this mobile rig might see. (0deg F)
My desire to over panel is to allow for simultaneous battery charging while operating the mini split during peak Sun hours.
1. What would your recommendations be for charge controllers?
I dont mind running multiple smaller controllers as i think it might same some money. And have no objections to changing panel configuration or even dropping down to (6) panels.
2. How much PV charging do i need? The battery banks have 100A daly BMS on each of them.
Thanks in advance. Cheers!
Attached is a diagram of my system.
I have all the components in hand except one of the charge controllers.
I'm thinking that i may have to change it up but calculating the solar charge controller needs is making my head spin when trying to factor for the temperatures this mobile rig might see. (0deg F)
My desire to over panel is to allow for simultaneous battery charging while operating the mini split during peak Sun hours.
1. What would your recommendations be for charge controllers?
I dont mind running multiple smaller controllers as i think it might same some money. And have no objections to changing panel configuration or even dropping down to (6) panels.
2. How much PV charging do i need? The battery banks have 100A daly BMS on each of them.
Thanks in advance. Cheers!