diy solar

diy solar

REC - Redneck Electrical Code

The contractor proceeded to unplug all the network cables from two 96 port switches (with multiple subnets and vlans) then REMOVED the labels on the wires.
Believe me when I tell you that is not as bad as a contractor hitting the EPO button on the way out the door because he thought it was a mag lock.

Holy crap that was a miserable month.
 
You've been looking in my shop haven't you? And my garage. And the barn.
Lol. Actually I have a few areas of unfinished business. Rebuilding the shed a year or so ago was very helpful and appreciated by a very important member of our family.

Looking at the tools I've obtained and looking at the garage gets me dreaming about a toolbox that actually holds things.

Projects like these happen when the needed day to day slows down for a period at a time. When it slows down. In the meantime...
 
Back
Top