Have 2 EG4's that I'm running testing on one only right now. What I'm seeing with these low rates of charging (1.5-3kw ish, gen 20kw, GEN set to 7kw) I was thinking having not setting up the units in parallel mode but on the same bus as generator if with the second unit with LOAD breaker off, no interconnect cable attached will still charge the single battery bank without damaging either inverter? I maybe wrong but there shouldn't be but thought I'd ask.