The Sol-Ark 12K currently has communication ability built into it that, with some software implementation, will allow it to communicate with power wall systems. I don't see why they won't be able to eventually program BMS'S with an RJ-45 connection capability in the near future. Just remember, most engineers at Sol-Ark didn't think that they would work with LTO SCIB batteries less than a year ago. Didn't care about lithium batteries of any type as their focus was on nickel hydride and cobalt along with lead acid. As more lithium fans have shown their desire for lithium battery bank builds, Sol-Ark has opened up to them. First thing they did was increase the maximum charging voltage from 59V to 63V. Now they are building an outside edition, have communication ports and many other possibilities. Personally, I think that they are the best one out there. Now, I would like to get my system totally completed and using it 24/7.As usual I am not explaining myself well. For my purposes battery capacity and state of charge is a complete non issue. What is important to me is that the charger is turned off if any 1 cell gets too high. I also do not want to disconnect the inverter if this happens. I also dont want to run high current through the BMS so I am hoping at some point the Inverter/charger companies figure out a generic way for an external BMS, that knows the actual battery health at the cell level, to controll charge/discharge if and only when necessary if a cell becomes out of balance.
The SolArk is installed with 20 380W panels. They replaced the meter yesterday, and sent the permission to operate this morning.@Haugen
Any updates with the Sol-ark?, i just discovered this inverters and wondering if you ended up buying it
The SolArk is installed with 20 380W panels. They replaced the meter yesterday, and sent the permission to operate this morning.
I'll be turning it on by tomorrow without batteries. I'm getting bus bars made so the batteries look as good as they perform.
I bought a $200 Heltec BMS for my SolArk system. It has CAN and RS485. I have to wait for my cells to arrive before I can power it up.
I'm hoping that is before my solar install, so I can leverage the expertise of the installer.
The Alibaba vendor sent me their CAN info, but most of it is in Chinese. I think there is enough English for someone who knows how to read the protocol to decipher it. I'm just not that guy.
You are on track with the reasons for the CAN bus. If the SolArk knows the SOC straight from the BMS, it can cut itself off at the appropriate time without relying on the BMS to cut the power both on the charge and discharge ends.Need to wake you up again @Haugen
Im doing some numbers to decide either between some pylontech batteries or a DIY one with the Heltec BMS.. same as yourself.
Fits of all, what would be the main advantages of the inverter communicating with the battery?.
Do you know if the CAN compatibility with generic BMS's its an special implementation from Sol-Ark?. I was considering a Deye / Sunsynk but maybe they wont provide that.. so that could steer things to the SolArk Again. Al tough, seeing the guys that are reverse engineered the communication protocol with the web monitoring, and if thats suposed to work with the 3 brands, it would mean that the Sol-Ark doesn't have an special firmware and the Heltec BMS could work also with the sunynk's and deye's.
- Being able to cut the charge / discharge depending of SOC, without a hard turnoff from an external BMS
- Maybe read SOC? (Altough you mention before that Sol-Ark can calculate this even with "dumb" batteries.
And when you are building your DIY battery?, im very interested in your experiment.
I am talking with some machinists to get some quality bus bars made. Those won't be ready until after the first of the year. My supplier said that they sent me a BMS that doesn't have CAN, so I'll have to run without that for a little while.
Yes that is the big advantage on the charge side. One could still use voltage signals as a last resort to stop charging. On the discharge side in a grid tied installation the appropriate signal from the BMS could transfer load back to the grid. That would be a good scenerio when one wanted more reserve at the bottom in the event of a power outage.You are on track with the reasons for the CAN bus. If the SolArk knows the SOC straight from the BMS, it can cut itself off at the appropriate time without relying on the BMS to cut the power both on the charge and discharge ends.
I'm fortunate to work at a large corporation with lots of people who have side gigs, or know people who do. That's how I found affordable machinists.I dont have your patience, ill already be putting some cupper tubing instead of the busbars .
Ill be watching your updates, thanks!
I'm a machinist but I don't have a machineI'm fortunate to work at a large corporation with lots of people who have side gigs, or know people who do. That's how I found affordable machinists.
Ots rather like buying the cells from China. To get the good price, you have to accept the time table. The first guy already came in way too high. Hoping the other guy will hook me up.
I posted about what I'm doing in another thread. I'll probably order extras to eliminate waiting later on.
DIY Busbar
Did you have any luck finding aluminum flange nuts with the norlock type flange? I found some aluminum lock washers but stopped looking. I'm keeping it simple and going with aluminum lock washers. I sourced them from Home Depot, of all places. I went with 1/4" size, which were much more...diysolarforum.com
I'm a machinist but I don't have a machine
It is funny that you said you have a milling attachment for your lathe. I've worked in machine shops my whole life and I never heard of the Lathe tool holder called a milling attachment. But I looked it up and from what I can tell, before I was born they called that a milling attachment.I don't have that one. I picked up a smaller, junkier one used/cheap:
View attachment 30370
But the vertical spindle is so stiff it won't start. Can't seem to remove pulley from top or otherwise get access to bearings, adjustment, or lube points.
I also have a 9" South Bend and milling attachment (right angle vice mount that goes on cross feed) but that's in a container on my mountain acreage.
I used machine tools a lot in school.
Now I use a cheap drill press or a corded/cordless drill for most work.
I have a conduit bender (up to 2") and a 2" power head for use with hand-held threading tools.
Hand held bandsaw, torch, arc welder for most fabrication.
I've seen (much) bigger mills used at auction, but I can barely get through my garage if I turn sideways so can't fit much.