NEpowerandlight
New Member
- Joined
- Sep 15, 2022
- Messages
- 119
I have an EG4 split phase inverter and I want to run the AC out to a main lug 125A sub panel so I can power up some new branch circuits. But I'd also like to be able to power some critical loads in my main panel when the power goes out. I think it would be easier and cheaper than moving critical loads to a sub panel?
So my question is: Can I run a 40 A circuit from the sub panel to a 40 A breaker in my main panel with an interlock? Is there any issues with having 2 breakers on the same circuit, one at the sub panel and one at the main panel?
As I ramp up my solar I'd like to be able to run a small mini split and 1 or 2 20 amp branch circuits from the inverter off grid through the sub panel and be able to have back up power.
So my question is: Can I run a 40 A circuit from the sub panel to a 40 A breaker in my main panel with an interlock? Is there any issues with having 2 breakers on the same circuit, one at the sub panel and one at the main panel?
As I ramp up my solar I'd like to be able to run a small mini split and 1 or 2 20 amp branch circuits from the inverter off grid through the sub panel and be able to have back up power.