Does anyone know if it is ok to run 2 separate transfer switches with 2 different sogens from the same main panel? Transfer switch had 10 circuits and I know people like to use them for power outages but I want to use mine to run on solar and only switch back to line (utility) if my batteries die. I’ve found other threads but they were looking to install 2 transfer switches to one generator. I just want to make sure I’m not breaking any codes. TIA