Still trying to develop a proper off grid system layout and placement. By way of background, I hope to have a total 2.5kw array separated into 2 different arrays on our house's roof with the wiring routed to the basement. Array 1 will feed 1 MPPT-1 and Array 2 will feed the second MPPT-2. Both MPPT outputs will be in parallel to feed a LiFePo 24v battery and inverter.
The electrical work will be inspected by an electrical inspector/underwriter as the AHJ requires it.
Any electrical cabinets and circuit breakers must be UL approved otherwise the system will not pass inspection.
Do you fellas have any recommendations for UL approved breakers and breaker panels? I've looked on the web and all that comes up is equipment that doesn't have UL acceptance.
Good ideas are much appreciated...
Thank,
Peter
The electrical work will be inspected by an electrical inspector/underwriter as the AHJ requires it.
Any electrical cabinets and circuit breakers must be UL approved otherwise the system will not pass inspection.
Do you fellas have any recommendations for UL approved breakers and breaker panels? I've looked on the web and all that comes up is equipment that doesn't have UL acceptance.
Good ideas are much appreciated...
Thank,
Peter