sundaju
New Member
My current setup
Ongrid
Growatt 5 kw with two mppt strings capability
Connected 12 x 250w panel in series to one string
Able to generate on an average 12 kWh per day
Offgrid
Luminous 5 kw solar inverter
Connected to 4 x 12v 200ah lead acid battery bank in series
Fed by 4 x 395w panel In series
My upgrade plan
Add 4 x 540 w bifacial panels to one string of the ongrid Inverter
Swap 12 x 250w panels out to offgrid inverter and bring the 4 x 395 w panel in series to the other string
?
Will the above be an optimal setup with minimum investment
Ongrid
Growatt 5 kw with two mppt strings capability
Connected 12 x 250w panel in series to one string
Able to generate on an average 12 kWh per day
Offgrid
Luminous 5 kw solar inverter
Connected to 4 x 12v 200ah lead acid battery bank in series
Fed by 4 x 395w panel In series
My upgrade plan
Add 4 x 540 w bifacial panels to one string of the ongrid Inverter
Swap 12 x 250w panels out to offgrid inverter and bring the 4 x 395 w panel in series to the other string
?
Will the above be an optimal setup with minimum investment