Hi,
I've bought a BMS without low temperatur cut off and found a way to control this through the use of external controllers.
My problem is, I would need an expensive normally closed (nc) relay to get it all work. This would cut off the current under certain circumstances. I don't want to go more into details, because this is just the backend story and should not be part of the discussion here.
The idea is to use a smaller and cheaper NC-relay to control the BMS which would then act like a big relay.
I've realized, the B- to P- is normally open when the BMS is not powered. Giving power to it this contact closes. That's exactly what I need.
Now I could attach a NC-relay between the thin B1- line which would cut off the BMS power and force the main-contact to open, and the other way round.
I've heard, this might be dangerous for the BMS, and I'd like to know if someone already made experiences here.

There are some multichannel-relays out there, maybe it would be less dangerous to cut off and reconnect all the 5 lines at the same time, or just the B*+ lines? (https://www.aliexpress.com/item/32649659086.html?spm=a2g0s.8937460.0.0.6f4b2e0esufgKd)
I've bought a BMS without low temperatur cut off and found a way to control this through the use of external controllers.
My problem is, I would need an expensive normally closed (nc) relay to get it all work. This would cut off the current under certain circumstances. I don't want to go more into details, because this is just the backend story and should not be part of the discussion here.
The idea is to use a smaller and cheaper NC-relay to control the BMS which would then act like a big relay.
I've realized, the B- to P- is normally open when the BMS is not powered. Giving power to it this contact closes. That's exactly what I need.
Now I could attach a NC-relay between the thin B1- line which would cut off the BMS power and force the main-contact to open, and the other way round.
I've heard, this might be dangerous for the BMS, and I'd like to know if someone already made experiences here.

There are some multichannel-relays out there, maybe it would be less dangerous to cut off and reconnect all the 5 lines at the same time, or just the B*+ lines? (https://www.aliexpress.com/item/32649659086.html?spm=a2g0s.8937460.0.0.6f4b2e0esufgKd)