I purchased an off grid home with a driven well. The system is a Trace SW4024 inverter, Flexmax 80 charge controller and a Trace T-240 conversion module. My well pump pressure switch wired with 120v and the pump is run from the T-240. Would it be better to wire the switch from the T-240 on one side and the pump on the other? Is it more efficient to have it wired the way it is wired? I tried to contact the person that installed the system but they haven't returned any of my calls or emails.