I'm attaching a diagram of the existing and proposed configurations. Basically, moving most of the loads to the subpanel, then adding a 2P-60 amp breaker for AC input to the inverter pulling from the main panel, adding a 2P-60 amp breaker for AC output from inverter feeding the subpanel, added a...