I currently have a 7.48kW Tesla panel system with 2 powerwalls, and will have my first true-up in April after almost 2 years (original install happened just after the annual true-up date). It looks like it will be close to even, possibly I will owe some. Right now it is powering my house...
Sorry, I probably garbled the heck out of my original post! I will be building a new permitted ADU, and existing solar on the main house will get me through permitting requirements to have solar. I am hoping to add some solar to the roof of the ADU after the building is signed off, and doing...