Today I went to open the handle of my shed and I got a nasty jolt, please help!! Here is my setup I have 8 450 watt panels on my shed. They are going to two SunGold power SP 6548 that I have in split phase. My AC in from the grid is going to both of my inverters. The main panel has...
so I bought my Sp6548 inverters and 400 ah of batteries in August of 2023. And for the most part I have been pleased with them but there are quirks that you guys are well aware of with the voltronics inverters mainly the flickering lights and lack of any support. Etc… When the 6000xp came...
I searched the Forum and did not see any real explanation on what happens AFTER the Overload Bypass occurs. Will it not transfer back to battery after the initial inrush settles down? This to me sounds like something that we would want on? Can someone who uses this feature explain what...
I have seen in several set ups that the EG4 power pro batteries when connected to the 18kPV used 2 positives and 2 negatives to connect one battery. I have also seen Will prowse connect one power pro to a 6500 using just one positive and one negative. Is there a reason for this? is the...
I have a SunGold power 6548 that I am planning on powering with some 12 volt power queen batteries in series. My inverters are currently up and running and using grid bypass and solar to power the current loads. all my connections are made except batteries to the circuit breaker. Could I...
Maybe some of you guys know the answer to this one. I have noticed in my electric meter usage that sometimes and mostly in the evenings that my sp6548 ‘s Are pulling small loads from the grid like between 35-80 watts. Not all the time and not during heavy sun or heavy PV production it’s...
I currently have 2 SunGold power 48 volt server rack batteries headed my way, my inverters are the SunGold power SP 6500 do I need to do anything to balance the batteries before use? The manual is 0 help on setting up communication cables. I currently have 4 12 volt power queen batteries...
I tried to set up closed loop coms on my SunGold power batteries and although it worked it would only allow my charge controller to output 20 amps to 3 batteries which is way to low. I reached out to SunGold Chinese power and they said I could change it with a program they emailed me called...
So today my pack #3 showed 100 percent charge but only able to take in 93.7AH I brought it up on PBMS and this is what it showed. Is there anything that can be done to combat this? Or has the battery already lost 6 percent capacity after only 160 charge cycles?
I recently went back to closed loop communication for my sungold batteries and my SP 6548 and even though the option 12 and 13 are presented in SOC% it seems the battery/inverter will not accept any value and returns to 0% on each value. So by default it determines at 14% it returns to grid...
I am Finishing up my instal on my Sun Gold Power SP6548 and as of now I have no battery and no solar hooked up. I have installed my sub panel and a few breakers just to test that everything is functional and works properly in Bypass mode. when I put my clamp meter on my AC OUT circuit breaker...
Thanks for the help yesterday guys!. I now know that I need to Earth ground my solar panels and it seems to be that the majority agree that the earth grounding conductor needs to be connected at one location. Which raises a few specific questions that maybe you guys could help with? Should I...